Calder Stewart Steel Factory

Location:
Milton, Otago
Area:
10500m2

As part of our plans to modernise operations and expand into our new location at Revolution Hills, we built a new state-of-the-art steel fabrication factory. Subject to extensive international research, the overall scope of the project was determined, both in terms of fabrications technologies that needed acquiring, along with the size and scope of the facility itself.

Built by our own team, the facility boasts extensive floor space – laid out to support and streamline fabrication operations – all conducted under a lean manufacturing framework.

The project included the installation of multiple gantry cranes along with the installation of fabrication equipment imported from Europe and the United States. The building was custom designed to support lean manufacturing processes and equipment and includes a roof customised with a view to outfitting it with solar power generation capabilities.