When Port of Nelson needed to expand its port operations, particularly with the need for more the dry storage space, we were commissioned to propose and deliver a design and build solution, a speciality at which we excel.

Providing building supply to the site was not without its challenges – due to the Kaikoura earthquake occurring during the build. This required a temporary shutdown of construction operations to audit any potential damage, along with dealing with road closures and finding suitable detours before the schedule could be resumed.

The project took a record five months to complete. Despite its speed of erection, health and safety on the project were excellent, meeting our industry-leading standards.